完成Logistic迴歸及類神經網路之崩塌模式的建立,使用坡度、坡向、降雨量、土地利用、土壤、地質、崩塌距離及道路距離等8個因子來描述崩塌機 translation - 完成Logistic迴歸及類神經網路之崩塌模式的建立,使用坡度、坡向、降雨量、土地利用、土壤、地質、崩塌距離及道路距離等8個因子來描述崩塌機 English how to say

完成Logistic迴歸及類神經網路之崩塌模式的建立,使用坡度、坡向、

完成Logistic迴歸及類神經網路之崩塌模式的建立,使用坡度、坡向、降雨量、土地利用、土壤、地質、崩塌距離及道路距離等8個因子來描述崩塌機率,繪製完成集水區的五級制崩塌風險圖。白河水庫集水區的崩塌成因或主因,從本計畫之崩塌評估模式解釋,對崩塌發生比的衝擊影響依序為:坡度、土地利用、道路距離、坡向、降雨量、地質、土壤及崩塌距離等,以坡度及土地利用對崩塌發生比的衝擊最大。
0/5000
From: -
To: -
Results (English) 1: [Copy]
Copied!
Complete Logistic regression and neural network model of the collapse, slope gradient, slope, precipitation, land use, soil, geology, collapsed distances and road distance 8 factors describing avalanche probability, completed five-tier system collapse risk map of the catchment area. Collapse of the Baihe reservoir catchment areas cause or reason from the assessment model to explain the collapse of the plan, than the impact on the collapse order: road distance, slope, land use, slope, rainfall, geology, soils and collapsing distance, slopes and land use on the collapse than the worst hit.
Being translated, please wait..
Results (English) 2:[Copy]
Copied!
Logistic regression and complete the establishment of the collapse neural network model, the use of slope, aspect, rainfall, land use, eight factors of soil, geology, distance and road collapses distance to describe the probability of collapse, rendering complete catchment five-tier system collapse risk maps. Cause or main cause of the collapse of Baihe Reservoir catchment area, from the collapse of the project assessment model to explain the occurrence of shocks than the collapse in order, is: slope, land use, road distance, slope, rainfall, geology, soil and collapse distance, so as to slope and land use impact of the collapse occurred than the maximum.
Being translated, please wait..
Results (English) 3:[Copy]
Copied!
Establishment of logistic regression and neural network mode of collapse of slope, slope, rainfall, land utilization, soil, geology, collapse distance and path distance, eight factors to describe the probability of landslide, finish drawing the catchment level five of collapse risk map is completed. Baihe reservoir watershed collapse cause or reason, from the collapse evaluation model interpretation, to collapse than the impact of sequence is: slope, land use, distance to roads, slope, rainfall, geology, soil and collapse distance, slope and land use of collapse occurred than the biggest impact.
Being translated, please wait..
 
Other languages
The translation tool support: Afrikaans, Albanian, Amharic, Arabic, Armenian, Azerbaijani, Basque, Belarusian, Bengali, Bosnian, Bulgarian, Catalan, Cebuano, Chichewa, Chinese, Chinese Traditional, Corsican, Croatian, Czech, Danish, Detect language, Dutch, English, Esperanto, Estonian, Filipino, Finnish, French, Frisian, Galician, Georgian, German, Greek, Gujarati, Haitian Creole, Hausa, Hawaiian, Hebrew, Hindi, Hmong, Hungarian, Icelandic, Igbo, Indonesian, Irish, Italian, Japanese, Javanese, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Korean, Kurdish (Kurmanji), Kyrgyz, Lao, Latin, Latvian, Lithuanian, Luxembourgish, Macedonian, Malagasy, Malay, Malayalam, Maltese, Maori, Marathi, Mongolian, Myanmar (Burmese), Nepali, Norwegian, Odia (Oriya), Pashto, Persian, Polish, Portuguese, Punjabi, Romanian, Russian, Samoan, Scots Gaelic, Serbian, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenian, Somali, Spanish, Sundanese, Swahili, Swedish, Tajik, Tamil, Tatar, Telugu, Thai, Turkish, Turkmen, Ukrainian, Urdu, Uyghur, Uzbek, Vietnamese, Welsh, Xhosa, Yiddish, Yoruba, Zulu, Language translation.

Copyright ©2024 I Love Translation. All reserved.

E-mail: